Spring were appointed as PM for the CAT A refurbishment of 3 vacant office floors together with the lift lobbies and reception. The works also included the formation of new shower rooms at basement level. Coordinating the design team and progressing the construction stages with 4 floors remaining occupied required regular consultation with the managing agents to ensure that tenant disruption was minimised.