Spring Logo
prev
next

Lead Consultant & CDM PD

Demolition and New Build - Eskmuir

Southend-On-Sea - £650,000
backback to case studies

Spring were appointed as Lead Consultant and CDM Principal Designer for a scheme to demolish an existing retail unit and replace with a new build drive thru coffee shop on a pre-let to a Starbucks Franchise. The demolition and build phases of the project were administered separately to enable works to progress on site whilst designs were finalised and to minimise the design risks.